Cut Edge Corrosion Treatment Bracknell

Survey, lap sealing and protective coatings for metal roofs and cladding — delivered with minimal disruption.
Book a Free Survey Call 07538 489392
Cut edge corrosion treatment and lap sealing project in Bracknell
Edges and laps stabilised, sealed and coated for long-term performance.

Cut edge corrosion starts where factory coatings end — at cut edges, side/end laps and around fixings. UV and weathering lift the finish, exposing steel and allowing moisture to track into joints. Left alone, this leads to staining, leaks and premature sheet replacement.

Featured in Bracknell: Food Unit — Clean Lap Finish — hygiene topcoat; lap sealing; night works. Outcome: bright, uniform finish.

Signs Your Building Needs Edge Repair

  • Feathered or lifting coatings at lap lines and edges
  • Rust streaks beneath joints or around bolt heads
  • Hairline gaps, pinholes or damp insulation under laps
  • Occasional water ingress during wind-driven rain

Our Cut Edge Corrosion Repair Process

Applying primers, lap sealants and protective roof coatings in Bracknell
Specified seal widths and topcoat returns for durability and appearance.
  1. Inspection & Planning: Diagnose delamination and corrosion; confirm access, sequencing and safety.
  2. Mechanical Prep: Remove failed Plastisol/paint; treat rust; degrease to a sound metal edge.
  3. Priming: Apply compatible metal primers to stabilise edges and prepared areas.
  4. Lap Sealing: Tool elastomeric sealant into side/end laps, bolt heads and penetrations to specified depth/width.
  5. Protective Coatings: Install UV-stable topcoats with returns beyond lap edges (typically ≥50 mm); QA and clean-down.

Where advanced steel loss exists, selective sheet replacement may be recommended following survey.

Why Riolett Services for Cut Edge Corrosion Treatment

  • Experienced teams with RAMS & COSHH provided as standard
  • Night/weekend programmes to keep tenants and logistics running
  • Consistent seal widths, tidy detailing at trims and fixings
  • Manufacturer-aligned specifications and written guarantees

Costs & Timescales

Pricing depends on extent of delamination, exposure, access and specification. Many projects are completed in 1–2 days plus curing, with night or weekend programmes available. Share photos or book a free survey for a fixed quotation.

Cut Edge Corrosion — FAQs

It occurs where the factory coating ends at cut sheet edges, side/end laps and fixings. UV and weathering lift the finish, exposing steel; moisture then tracks into joints, accelerating corrosion.

We mechanically remove failed coatings, treat corrosion, apply compatible primers, tool elastomeric sealant to laps/fixings and install UV-stable topcoats with specified returns for long-term protection.

Yes. We regularly run night/weekend programmes to keep tenants trading and logistics moving.

Recent Work Near Bracknell

  • Business Park Block — Edge Stabilisation — cut edges & side/end laps; 1–2 days. Result: strong adhesion; neat lap lines.
  • Logistics Hub — Reseal & Protect — laps; gutters; penetrations; phased nights. Result: clear drainage; sealed joints.
  • Retail Parade — Plastisol Failure Fix — delam removal; prime & coat; 2 nights. Result: even coverage; UV-stable coat.
  • Fitness Unit — Trim & Fixing Detailing — bolt heads; trims; returns; weekend. Result: crisp detailing; consistent colour.
  • Warehouse South — Edge Defence — eaves edges; end laps; evening shift. Result: sealed edges; long-life topcoat.

Map — Projects Around Bracknell

See where we’ve been working in Bracknell.

We can schedule out-of-hours programmes across Bracknell.

Client Reviews

Keira J. (Regional Manager)
July 2025 • ★★★★★

Value for money and a durable finish across elevations.

Frances M. (Facilities Lead)
June 2025 • ★★★★★

Detailed survey, clear spec and a watertight result. Looks excellent.

Damien C. (Store Manager)
June 2025 • ★★★★★

Night works meant no downtime. Finish is neat and consistent.

Soraya H. (Ops Supervisor)
June 2025 • ★★★★★

Great prep and tidy masking. The lap seals are spot on.

Marta L. (Tenant Rep)
July 2025 • ★★★★★

Professional team and a clean handover each day.

Lewis P. (Centre Manager)
July 2025 • ★★★★★

Leak paths closed at end laps—no more staining.

Contact & Coverage

Riolett Services
Tel: 07538 489392

Service area: Bracknell and nearby locations.

Related services: Cladding RepairsCladding SprayingCut Edge Corrosion Treatment Maidenhead

Ready for a fixed quote? Send photos or book a survey — we’ll confirm scope, programme and pricing.
Book a Free Survey Call 07538 489392